Roofers won't touch the framing. Deck builders won't touch the roof. The leak lives in between — and that's the work we do.
That question is exactly why these decks stay broken. A roofer will look at the membrane and decline to touch the framing sitting on it. A deck builder will look at the framing and decline to touch the roof. Meanwhile the leak lives at the seam between the two — usually a penetration where a post base passes through the assembly, or a flashing detail at a curb or a wall. We work that seam deliberately: we diagnose the membrane, the flashings and the penetrations together with the sleepers, framing and railings, and tell you which trade's problem it actually is before anybody starts removing boards.
A roofing membrane is designed to shed water on a surface nobody walks on. A pedestrian deck waterproofing system is designed to do that while also taking foot traffic, furniture and point loads. When a standard roofing membrane gets installed where a pedestrian system belongs — which happens often, because it is cheaper and looks the same on day one — it cracks within a couple of seasons. If your Locust Point deck was renovated on a budget and started leaking within a few years, that mismatch is one of the first things we check for.
Start from the fact that there is no exemption to fall under: decks are absent from Baltimore City's list of work exempt from permit, so there is no size or height threshold like Baltimore County's 16 inches or 120 square feet. For a rooftop deck the sequence is construction documents signed and sealed by an architect or engineer licensed in Maryland; written notification to adjoining property owners with evidence of that notice submitted alongside the documents; the permit itself; then city-performed inspections at footing and final. If your block falls within a historic district, approval from CHAP has to come before the building permit — we confirm designation by address before anything else.
Designation is determined address by address, not by neighborhood name, so we check yours rather than guessing. The CHAP historic districts that most often affect rooftop deck work in this part of Baltimore are Fells Point, Federal Hill, Upper Fells Point and Mount Vernon. If an address does fall inside a district, the order of operations changes completely: CHAP approval comes before the building permit, no deck may be visible from the front of the structure, stair penthouses are discouraged in favor of internal stair or hatch access, and raw unpainted pressure-treated lumber is generally not approved.
Height, infill spacing and — most importantly — what the posts are actually fastened to. Guards are required where a walking surface is more than 30 inches above the level below, must be at least 36 inches high on a one- or two-family home, and must not have any opening a 4-inch sphere can pass through. On a rooftop deck the attachment is the real question, because a post base that penetrates the waterproofing is simultaneously a structural connection and a hole in your roof. We check that the guard is solid and that the penetration under it is properly flashed, because on these decks those two problems are the same problem.
Free inspection, written estimate, and a straight repair-or-replace recommendation — no pressure and no upsell.
📞 Call (667) 239-8644 Request a Free Quote